OPERATIONAL COSTS

Labour costs for the assembly will run about $2,000 per vehicle. The average time required to assemble a Cobra kit, for example, is between 150 and 200 hours. With building operations costs and salary overhead of $71,548 per year (shown below), every vehicle will have an assembly cost of $8,943.50 in the first year with eight vehicles sold. This will drop to approximately $6,060.33 in the second year. This is with 16 vehicles sold and a five percent inflation rate taken into consideration.

...
Cost Breakdown (1st year)
Description Per Month Per Year
Rent for shop $750.00 $9,000.00
Utilities (hydro, phone) 500.00 6,000.00
Advertising 967.00 11,604.00
Insurance 240.00